APC RAID Subsystem SCSI-SATA II Specifiche Pagina 42

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 100
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 41
Step 4. Secure the power cord with the cable clamp. Flip open the cable
clamp and wrap it around the power plug. If necessary, use the
release tab to adjust the location of the clamp so it aligns with the base
of the power cord as shown below. Press the clip lock on the side of
the clamp until it snaps into position. Now the power cord connection
is secured.
Figure 2-17: Power Cord Locked into Position
2-18
Step 5. Repeat the process to secure every power cords to the subsystem.
Power Cord Cable Clamp Installation
Vedere la pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 99 100

Commenti su questo manuale

Nessun commento