APC AP7921 Manuale di Installazione Pagina 8

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 24
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 7
Install the Switched Rack PDU
4 Switched Rack PDU Installation and Quick-Start Manual
Install in an enclosure or
rack
You can mount the Switched Rack PDU in a 19-inch NetShelter
®
enclosure or rack or other EIA-310-D standard 19-inch rack. To install
the PDU in a NetShelter enclosure:
1. Choose a mounting position for the PDU with either the display or
the rear facing out of the enclosure.
2. Attach the mounting brackets to the PDU, using the flat-head
screws (provided).
3. Choose a location for the unit:
Note
The unit occupies one U-space. A notched hole on the
enclosures vertical rail indicates the middle of a U-space.
19
1 U
20
21
Vedere la pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 23 24

Commenti su questo manuale

Nessun commento