2. Installation
Parallel configuration without external bypass cabinet and with separate normal and Bypass AC
inputs (maximum two units in parallel)
Upstream and downstream earth protection cables must be connected in compliance with the single UPS system
earthing arrangement.
For TNC upstream configuration, TNC option must be connected into each UPS.
If the UPS installation is equipped with earth-leakage protection upstream then you must install an isolated
transformer on each Bypass AC (A) and each Normal AC (B) sources.
Normal AC
15
Bypass AC
16
14
Normal AC
15
Bypass AC
16
14
B
A